Fresh plaster around a window and entrance door

Planning plastering around other work

Agree the surfaces, preparation and room access before the plastering starts.

Be specific about the surfaces

List the walls, ceilings and smaller areas that need work. A room photograph helps explain the overall job; a closer image can show the state of the existing plaster or board.

Sequence the other trades

If sockets, pipework, windows or doors are being changed, discuss the order with the people doing the work. The plastering plan should account for any changes to the surfaces.

Prepare the room

Agree how the room will be cleared and what protection is needed. Mention furniture that cannot be moved and the route through the property.

Before decorating

Ask Kelvin for drying and preparation advice for the material used and the conditions in your room. Arrange decorating around that advice, rather than assuming every surface is ready on the same day.

Useful next step

Discuss the work with Kelvin.

Kelvin standing in front of the AAA Developments van
Roofing · Plastering · Rendering

GET A QUOTE FROM KELVIN.

Tell Kelvin what needs doing. Call or send photos on WhatsApp.